Pacific Blue Reflective Long Lead - 30ft, coiled with black carabiner, shown on white background.

Pacific Blue Reflective Dog Long Lead — 30ft Recall Leash

€48,00
Sale price  €48,00 Regular price 
Skip to product information
Pacific Blue Reflective Long Lead - 30ft, coiled with black carabiner, shown on white background.

Pacific Blue Reflective Dog Long Lead — 30ft Recall Leash

Free Shipping & Easy Returns
10% Off When You Buy 2+ Items

€48,00
Sale price  €48,00 Regular price 
Details

Give your dog extra freedom to explore while maintaining control with this 30 ft rope leash, which can also serve as a camping tie-out. Do not leave a dog unattended when using it as a tie-out.

  • Total length: 30 ft
  • Constructed from tightly twisted polypropylene/polyester ⁵⁄₁₆ in rope
  • Reflective strands are woven into the rope to improve visibility in low or no light conditions
  • Aluminum carabiner swivels and locks
    • Carabiner width: 1.5 in
    • Carabiner length: 2.5 in
    • Rated for 3 kN
  • Designed for dogs of all sizes

You might also like...