{"product_id":"pacific-blue-reflective-dog-long-lead-30ft-recall-leash","title":"Pacific Blue Reflective Dog Long Lead — 30ft Recall Leash","description":"\u003cdiv\u003e\u003carticle\u003e\n\u003cp\u003eGive your dog extra freedom to explore while maintaining control with this 30 ft rope leash, which can also serve as a camping tie-out. Do not leave a dog unattended when using it as a tie-out.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eTotal length: 30 ft\u003c\/li\u003e\n\u003cli\u003eConstructed from tightly twisted polypropylene\/polyester \u003cspan\u003e⁵⁄₁₆ in\u003c\/span\u003e rope\u003c\/li\u003e\n\u003cli\u003eReflective strands are woven into the rope to improve visibility in low or no light conditions\u003c\/li\u003e\n\u003cli\u003eAluminum carabiner swivels and locks\n\u003cul\u003e\n\u003cli\u003eCarabiner width: 1.5 in\u003c\/li\u003e\n\u003cli\u003eCarabiner length: 2.5 in\u003c\/li\u003e\n\u003cli\u003eRated for 3 kN\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/li\u003e\n\u003cli\u003eDesigned for dogs of all sizes\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/article\u003e\u003c\/div\u003e","brand":"{-orntli}}","offers":[{"title":"Default Title","offer_id":57752315560309,"sku":"CLDBTY7UOH","price":48.0,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0931\/2914\/6741\/files\/wilderdog-white-20260929-29234323325101.jpg?v=1794242718","url":"https:\/\/orntli.com\/products\/pacific-blue-reflective-dog-long-lead-30ft-recall-leash","provider":"orntli","version":"1.0","type":"link"}